Market brief¶
Twice-weekly brief (YYYY-MM-DD.md in this folder) and the meeting where the owner picks notes, replies, leads and builds.
Log¶
-
2026-10-15: meeting. Approvals (7 drafts): later today. Note ideas: none picked (the Section 301 tariff note was already URGENT at the top of the backlog). Threads: none. Leads: none (the brief had no strong ones). Builds: ship /tools/impedance (built on branch
tool-impedance) and a new coin-cell pulse budget calculator, both in embeddedera-site Open. -
2026-10-19: meeting. Drafts: owner reviewing 6 in app. Notes picked: ESP32-S3 RGB flicker, SD logging. Thread: Nordic DFU rollback. Lead: ZeroWire (no role address on site, contact links given, no draft). Build to-do: Web Serial flasher.
- 2026-10-22 meeting: approvals (3 drafts) reviewed by owner now; queued 2 notes (thermistor ADC, capacitive ghost touches); no threads; no lead drafts; build: thermistor calculator added to embeddedera-site Open.
- 2026-10-26: meeting held. Drafts: owner approving now. Picked 2 notes (shunt/Hall/CT; ESP32-S3 RGB flicker, overlaps 10-19 pick). Threads, leads, builds: none.
- 2026-10-29 meeting: drafts -> approve now (7 waiting, owner approves); queued 9 PICKED notes (4 flagged overlap with existing picks/drafts); threads, leads, builds: none chosen (no preference).
- 2026-11-02 meeting: drafts -> approve now (7 waiting). Owner: notes repeat, wants variety; pruned 8 overlapping PICKED lines (DROPPED) and queued 7 new: 2 case studies, 2 buyer guides, 1 news explainer (PIC32MZ EOL), 2 worked examples. Threads: none. Leads: none. Build: I2C pull-up calculator added to embeddedera-site Open.
- 2026-11-02 rebuild (owner: no forum replies, wants more sources): new ~/.local/bin/site-data-digest (Search Console via search-report + Bing Webmaster + Clarity -> market-brief/site-data-
.md, run by the meeting first); meeting-prompt step 3 'Threads' replaced by 'What visitors already want'; routine-prompt + cloud routine trig_01TueZEVC69Voq5PWuPHBsuA updated: buyer-side sources first (campaigns, funding, hiring, FCC), supply-chain/PCN, competitors; 'Reply opportunities' replaced by 'Launches and funding'; forums only for topics. Not built yet: outcome tracking (note->traffic->lead), BOM-check/quote/inbound-email digest, PCN matching against customer parts. - 2026-11-02: outcome tracking built: ~/.local/bin/note-outcomes (46 notes x Search Console 28 d -> projects/market-brief/outcomes.md, roll-ups by type and topic, verdicts after 14 d, weekly snapshot in ~/.local/state/market-brief/outcomes-
.json for change), included in site-data-digest; meeting step 2 opens with winners/invisible. Gap: leads not attributed to notes (to-do in embeddedera-site Open). First reading: ESD, pogo-pin fixture win; 13 of 26 'other' notes invisible; obsolescence/manufacturing topics 0 clicks. - 2026-11-09: Meeting held. Drafts: owner chose approve now. Notes: none picked. Visitor fixes picked: ESD note refresh (backlog), Gerber viewer ranking, Spanish thermistor page, /quote/ dead clicks (embeddedera-site Open). Leads: none. Build: none. Vault sync was blocked by a dead rebase-merge dir from 2026-11-08 20:11; autostash kept as a stash entry, dir removed.