Skip to content

Daily upkeep 2026-10-27

Quiet for the librarian: today's sessions (alerts root-fix, Cloudflare cloudflared upgrade, Friending NDA, Shower Drying call prep, Eugene's 5th/6th emails) already wrote their own Log lines, cards and to-dos. Checked every digest message against the commits; no card, Log or memory gap found.

Edits

  • map/reports/daily-2026-10-27.md: this report. No other file changed.

Checks

  • Cards: host/cloudflare-access.md has the 10-27 cloudflared upgrade; storage/precious-copy.md has the precious-sync fix.
  • Corrections/likes: none in the digest beyond requests ("don't send, just attach to the draft" is already email-draft-only). Nothing said twice.
  • Lint: projects/plex-server.md (428) and projects/kicad-autorouter.md (401) over 400; both already reported, left alone.

Needs you

  • projects/embeddedera-site.md Open: the three Eugene 10-27 to-dos (dedupe regression, ratio finder, level shifter) are BUILT on preview branch tool-eugene-oct27 but not merged; they stay open until you say "merge" and pick the symbol (A recommended). The Eugene preview-links draft is unsent.
  • Friending: signed PDF reply draft waits for you to send; discard the obsolete "One last tidy-up" draft.
  • Shower Drying call Thu 10-29 16:20: decide whether to give a Phase 0 price range.
  • Optional leftovers from the alerts chat: delete branch rescue/pt100-2026-10-27 and ~/.local/state/rescued-og/ after a week.