Daily upkeep 2026-10-26¶
Quiet for the librarian: today's sessions (booking calendar, seasonal themes, Trace Rush, SEO/marketing audit, SOP audit, PC audit, Immich v3 + wall-panel key, UPS plan, KiCad fork branch, Vaultwarden server account) already wrote their own Log lines, cards (immich.md, vaultwarden.md, machine.md, schedules.md, alerting.md) and to-dos. Checked against the digest; no card or Log gap found.
Edits¶
map/reports/daily-2026-10-26.md: this report. No other file changed.
Checks¶
- Corrections/likes: none in the digest beyond approvals ("Merge", "Implement idea 2", "Yes"); the seasonal Idea 2 choice is already logged in
projects/embeddedera-site.md. Nothing said twice. - Lint:
projects/plex-server.md(421 lines) andprojects/kicad-autorouter.md(401) are over the 400 limit; left alone.
Needs you¶
- Two secrets were pasted in chat today (Immich wall-panel API key, 15:35; Google PageSpeed API key, 12:57). They sit in transcripts. Both were stored by the sessions; consider rotating once the Vaultwarden push is set up. Not copied into any note.
- Ubuntu updates are still not run (
projects/plex-server.mdline 76): owner step before the UPS power-off. projects/plex-server.mdis 421 lines; archiving older Log lines would clear the lint.